African swine fever,
Poland
Information received on 03/02/2015 from Dr Krzysztof Jazdzewski, Deputy Chief Veterinary Officer, Ministry of Agriculture and Rural Development, General Veterinary Inspectorate, VARSOVIE, Poland
Summary
Report type Follow-up report No. 36
Date of start of the event 22/05/2014
Date of confirmation of the event 22/05/2014
Report date 03/02/2015
Date submitted to OIE 03/02/2015
Date event resolved 07/03/2018
Reason for notification Recurrence of a listed disease
Date of previous occurrence 31/03/2014
Manifestation of disease Clinical disease
Causal agent African swine fever virus
Nature of diagnosis Laboratory (advanced)
This event pertains to a defined zone within the country
Related reports Immediate notification (30/05/2014)
Follow-up report No. 1 (06/06/2014)
Follow-up report No. 2 (13/06/2014)
Follow-up report No. 3 (23/06/2014)
Follow-up report No. 4 (27/06/2014)
Follow-up report No. 5 (04/07/2014)
Follow-up report No. 6 (11/07/2014)
Follow-up report No. 7 (18/07/2014)
Follow-up report No. 8 (23/07/2014)
Follow-up report No. 9 (01/08/2014)
Follow-up report No. 10 (08/08/2014)
Follow-up report No. 11 (14/08/2014)
Follow-up report No. 12 (22/08/2014)
Follow-up report No. 13 (29/08/2014)
Follow-up report No. 14 (08/09/2014)
Follow-up report No. 15 (15/09/2014)
Follow-up report No. 16 (19/09/2014)
Follow-up report No. 17 (29/09/2014)
Follow-up report No. 18 (03/10/2014)
Follow-up report No. 19 (13/10/2014)
Follow-up report No. 20 (17/10/2014)
Follow-up report No. 21 (24/10/2014)
Follow-up report No. 22 (04/11/2014)
Follow-up report No. 23 (07/11/2014)
Follow-up report No. 24 (14/11/2014)
Follow-up report No. 25 (21/11/2014)
Follow-up report No. 26 (28/11/2014)
Follow-up report No. 27 (05/12/2014)
Follow-up report No. 28 (12/12/2014)
Follow-up report No. 29 (19/12/2014)
Follow-up report No. 30 (24/12/2014)
Follow-up report No. 31 (02/01/2015)
Follow-up report No. 32 (09/01/2015)
Follow-up report No. 33 (16/01/2015)
Follow-up report No. 34 (23/01/2015)
Follow-up report No. 35 (30/01/2015)
Follow-up report No. 36 (03/02/2015)
Follow-up report No. 37 (11/02/2015)
Follow-up report No. 38 (18/02/2015)
Follow-up report No. 39 (25/02/2015)
Follow-up report No. 40 (04/03/2015)
Follow-up report No. 41 (11/03/2015)
Follow-up report No. 42 (18/03/2015)
Follow-up report No. 43 (25/03/2015)
Follow-up report No. 44 (01/04/2015)
Follow-up report No. 45 (08/04/2015)
Follow-up report No. 46 (15/04/2015)
Follow-up report No. 47 (23/04/2015)
Follow-up report No. 48 (29/04/2015)
Follow-up report No. 49 (07/05/2015)
Follow-up report No. 50 (14/05/2015)
Follow-up report No. 51 (21/05/2015)
Follow-up report No. 52 (28/05/2015)
Follow-up report No. 53 (08/06/2015)
Follow-up report No. 54 (10/06/2015)
Follow-up report No. 55 (17/06/2015)
Follow-up report No. 56 (24/06/2015)
Follow-up report No. 57 (03/07/2015)
Follow-up report No. 58 (08/07/2015)
Follow-up report No. 59 (16/07/2015)
Follow-up report No. 60 (23/07/2015)
Follow-up report No. 61 (31/07/2015)
Follow-up report No. 62 (06/08/2015)
Follow-up report No. 63 (12/08/2015)
Follow-up report No. 64 (21/08/2015)
Follow-up report No. 65 (28/08/2015)
Follow-up report No. 66 (17/09/2015)
Follow-up report No. 67 (23/09/2015)
Follow-up report No. 68 (30/09/2015)
Follow-up report No. 69 (07/10/2015)
Follow-up report No. 70 (15/10/2015)
Follow-up report No. 71 (22/10/2015)
Follow-up report No. 72 (29/10/2015)
Follow-up report No. 73 (06/11/2015)
Follow-up report No. 74 (18/11/2015)
Follow-up report No. 75 (25/11/2015)
Follow-up report No. 76 (03/12/2015)
Follow-up report No. 77 (09/12/2015)
Follow-up report No. 78 (16/12/2015)
Follow-up report No. 79 (23/12/2015)
Follow-up report No. 80 (30/12/2015)
Follow-up report No. 81 (07/01/2016)
Follow-up report No. 82 (13/01/2016)
Follow-up report No. 83 (20/01/2016)
Follow-up report No. 84 (27/01/2016)
Follow-up report No. 85 (03/02/2016)
Follow-up report No. 86 (11/02/2016)
Follow-up report No. 87 (02/03/2016)
Follow-up report No. 88 (09/03/2016)
Follow-up report No. 89 (16/03/2016)
Follow-up report No. 90 (24/03/2016)
Follow-up report No. 91 (01/04/2016)
Follow-up report No. 92 (06/04/2016)
Follow-up report No. 93 (14/04/2016)
Follow-up report No. 94 (22/04/2016)
Follow-up report No. 95 (27/04/2016)
Follow-up report No. 96 (05/05/2016)
Follow-up report No. 97 (13/05/2016)
Follow-up report No. 98 (18/05/2016)
Follow-up report No. 99 (25/05/2016)
Follow-up report No. 100 (02/06/2016)
Follow-up report No. 101 (09/06/2016)
Follow-up report No. 102 (16/06/2016)
Follow-up report No. 103 (23/06/2016)
Follow-up report No. 104 (24/06/2016)
Follow-up report No. 105 (04/07/2016)
Follow-up report No. 106 (07/07/2016)
Follow-up report No. 107 (14/07/2016)
Follow-up report No. 108 (20/07/2016)
Follow-up report No. 109 (28/07/2016)
Follow-up report No. 110 (03/08/2016)
Follow-up report No. 111 (08/08/2016)
Follow-up report No. 112 (10/08/2016)
Follow-up report No. 113 (11/08/2016)
Follow-up report No. 114 (12/08/2016)
Follow-up report No. 115 (13/08/2016)
Follow-up report No. 116 (17/08/2016)
Follow-up report No. 117 (17/08/2016)
Follow-up report No. 118 (19/08/2016)
Follow-up report No. 119 (22/08/2016)
Follow-up report No. 120 (25/08/2016)
Follow-up report No. 121 (26/08/2016)
Follow-up report No. 122 (31/08/2016)
Follow-up report No. 123 (05/09/2016)
Follow-up report No. 124 (07/09/2016)
Follow-up report No. 125 (12/09/2016)
Follow-up report No. 126 (27/09/2016)
Follow-up report No. 127 (27/09/2016)
Follow-up report No. 128 (30/09/2016)
Follow-up report No. 129 (05/10/2016)
Follow-up report No. 130 (13/10/2016)
Follow-up report No. 131 (19/10/2016)
Follow-up report No. 132 (26/10/2016)
Follow-up report No. 133 (02/11/2016)
Follow-up report No. 134 (10/11/2016)
Follow-up report No. 135 (18/11/2016)
Follow-up report No. 136 (24/11/2016)
Follow-up report No. 137 (30/11/2016)
Follow-up report No. 138 (08/12/2016)
Follow-up report No. 139 (14/12/2016)
Follow-up report No. 140 (21/12/2016)
Follow-up report No. 141 (29/12/2016)
Follow-up report No. 142 (11/01/2017)
Follow-up report No. 143 (18/01/2017)
Follow-up report No. 144 (25/01/2017)
Follow-up report No. 145 (01/02/2017)
Follow-up report No. 146 (08/02/2017)
Follow-up report No. 147 (15/02/2017)
Follow-up report No. 148 (22/02/2017)
Follow-up report No. 149 (01/03/2017)
Follow-up report No. 150 (08/03/2017)
Follow-up report No. 151 (15/03/2017)
Follow-up report No. 152 (29/03/2017)
Follow-up report No. 153 (05/04/2017)
Follow-up report No. 154 (12/04/2017)
Follow-up report No. 155 (21/04/2017)
Follow-up report No. 156 (04/05/2017)
Follow-up report No. 157 (16/05/2017)
Follow-up report No. 158 (02/06/2017)
Follow-up report No. 159 (09/06/2017)
Follow-up report No. 160 (09/06/2017)
Follow-up report No. 161 (12/06/2017)
Follow-up report No. 162 (14/06/2017)
Follow-up report No. 163 (19/06/2017)
Follow-up report No. 164 (20/06/2017)
Follow-up report No. 165 (21/06/2017)
Follow-up report No. 166 (23/06/2017)
Follow-up report No. 167 (27/06/2017)
Follow-up report No. 168 (29/06/2017)
Follow-up report No. 169 (30/06/2017)
Follow-up report No. 170 (03/07/2017)
Follow-up report No. 171 (05/07/2017)
Follow-up report No. 172 (07/07/2017)
Follow-up report No. 173 (11/07/2017)
Follow-up report No. 174 (13/07/2017)
Follow-up report No. 175 (19/07/2017)
Follow-up report No. 176 (20/07/2017)
Follow-up report No. 177 (24/07/2017)
Follow-up report No. 178 (26/07/2017)
Follow-up report No. 179 (31/07/2017)
Follow-up report No. 180 (02/08/2017)
Follow-up report No. 181 (08/08/2017)
Follow-up report No. 182 (09/08/2017)
Follow-up report No. 183 (17/08/2017)
Follow-up report No. 184 (21/08/2017)
Follow-up report No. 185 (22/08/2017)
Follow-up report No. 186 (23/08/2017)
Follow-up report No. 187 (25/08/2017)
Follow-up report No. 188 (28/08/2017)
Follow-up report No. 189 (30/08/2017)
Follow-up report No. 190 (01/09/2017)
Follow-up report No. 191 (06/09/2017)
Follow-up report No. 192 (09/09/2017)
Follow-up report No. 193 (12/09/2017)
Follow-up report No. 194 (13/09/2017)
Follow-up report No. 195 (15/09/2017)
Follow-up report No. 196 (20/09/2017)
Follow-up report No. 197 (22/09/2017)
Follow-up report No. 198 (27/09/2017)
Follow-up report No. 199 (28/09/2017)
Follow-up report No. 200 (29/09/2017)
Follow-up report No. 201 (05/10/2017)
Follow-up report No. 202 (11/10/2017)
Follow-up report No. 203 (12/10/2017)
Follow-up report No. 204 (20/10/2017)
Follow-up report No. 205 (26/10/2017)
Follow-up report No. 206 (02/11/2017)
Follow-up report No. 207 (10/11/2017)
Follow-up report No. 208 (16/11/2017)
Follow-up report No. 209 (23/11/2017)
Follow-up report No. 210 (29/11/2017)
Follow-up report No. 211 (01/12/2017)
Follow-up report No. 212 (11/12/2017)
Follow-up report No. 213 (15/12/2017)
Follow-up report No. 214 (22/12/2017)
Follow-up report No. 215 (29/12/2017)
Follow-up report No. 216 (04/01/2018)
Follow-up report No. 217 (08/01/2018)
Follow-up report No. 218 (12/01/2018)
Follow-up report No. 219 (15/01/2018)
Follow-up report No. 220 (25/01/2018)
Follow-up report No. 221 (05/02/2018)
Follow-up report No. 222 (26/02/2018)
Follow-up report No. 223 (07/03/2018)
Follow-up report No. 224 (14/03/2018)
New outbreaks (1)
Outbreak 1 Pucilki, Sokolka, Sokolski, Podlaskie
Date of start of the outbreak 30/01/2015
Outbreak status Resolved (31/03/2015)
Epidemiological unit Farm
Affected animals
Species Susceptible Cases Deaths Killed and disposed of Slaughtered
Swine 7 5 0 7 0
Summary of outbreaks Total outbreaks: 1
Total animals affected
Species Susceptible Cases Deaths Killed and disposed of Slaughtered
Swine 7 5 0 7 0
Outbreak statistics
Species Apparent morbidity rate Apparent mortality rate Apparent case fatality rate Proportion susceptible animals lost*
Swine 71.43% 0.00% 0.00% 100.00%
*Removed from the susceptible population through death, destruction and/or slaughter
Epidemiology
Source of the outbreak(s) or origin of infection
  • Unknown or inconclusive
Epidemiological comments The notified outbreak of African swine fever in pigs has been detected in the already infected area under certain restrictions concerning African swine fever (this area has been established in accordance with the European Union legislation - Commission Implementing Decision 2014/709/EU). Proper restrictions concerning African swine fever in pigs have been additionally implemented.
Control measures
Measures applied
  • Movement control inside the country
  • Screening
  • Disinfection / Disinfestation
  • Quarantine
  • Stamping out
  • Control of wildlife reservoirs
  • Zoning
  • Vaccination permitted (if a vaccine exists)
  • No treatment of affected animals
Measures to be applied
  • No other measures
Diagnostic test results
Laboratory name and type Species Test Test date Result
National Veterinary Research Institute (National laboratory) Swine real-time PCR 31/01/2015 Positive
Future Reporting
The event is continuing. Weekly follow-up reports will be submitted.
Map of outbreak locations